Aplin Martin was retained by Tamani Communities to provide construction management services of the grading operations within Stage 3 of Riversong. Preliminary Engineering Design, Cost Assessment and Geotechnical Investigation was completed to determine the scope.
The 22-hectare site was a challenging grading operation because it required Aplin & Martin to coordinate directly with multiple parties and consultants, including the Town of Cochrane as well as an adjacent developer. Also, in coordination with the parties mentioned, Aplin & Martin created the Staged Master Drainage Plan for Stage 3 which incorporated stormwater drainage to two separate stormwater management facilities. The project is ongoing and the civil works have proceeded on time and within budget.