Aplin Martin was engaged for our civil engineering services regarding a 10 lot subdivision. These services included the preliminary and detailed design of the entire site and required us to work closely with the client, neighbours and the City of Calgary in order to create quality design exemptions that were required for this infill lot. Aplin Martin followed the City of Calgary UDO submission process for this project.
Aplin Martin worked closely with local agencies, City departments, and adjacent property owners to ensure all existing conditions would be maintained and cost-sharing for existing infrastructure completed.
Engineering services included the preliminary and detailed design, project management, cost estimates, stormwater management, tender and contract administration. Inspection services, shallow utility coordination and completing as-built drawings, are to be completed once construction is underway (Spring 2017).